The steady pulse of construction continues across the Red River Valley, as the latest batch of building permits published Aug. 29, 2026, offers a detailed look at what property owners, contractors, and developers are planning. From modest deck additions to multimillion-dollar commercial projects, the permits span three cities: West Fargo, Fargo, and Moorhead.

West Fargo leads with a mix of residential and commercial work. Skapa Construction secured the largest permit in the city: a $1.2 million new commercial project at 2585 Summit Way E. Residential remodels also dominate, with McFadden Electric undertaking a $147,000 remodel at 2624 2nd St. E., and Allied Build and Remodel handling a smaller $1,500 job at 2053 11th St. W. Deck builders are busy too: Finish Line Construction is adding a $17,950 deck at 617 36th Ave. W., while Deck Builders is at 1654 10th St. W. for $18,800. Ryezon Construction appears twice: a $54,720 shed at 435 11th St. W. and a $12,985 shed at 2129 14th St. W. Other notable West Fargo permits include a $30,787 residential remodel by Groundworks Minnesota at 330 5th Ave. E., a $485,000 remodel by Radiant Creative Homes at 2608 1st St. E., and a $294,534 commercial remodel by Comstock Construction at 1262 Main Ave. W.

In Fargo, the activity is equally diverse. Matt Development Company is spearheading a $1.3 million new commercial project at 2300 46th St. S., while RBF Contracting is remodeling a commercial space at 242 9th Ave. S. for $693,442. The residential sector sees a $558,349 new home by Krueger Construction at 2669 65th Ave. S., and a $550,000 new home by Cornerstone Custom Homes at 4265 Pine Parkway S. Designer Homes of FM is investing $300,000 in a remodel at 4708 32nd St. S., and Legend Builders has an $80,000 remodel at 3130 36th Ave. S. Deck specialists like Premium Decks are busy with multiple projects, including a $25,000 deck at 5457 Lori Lane W. and a $20,000 deck at 2641 8th St. W. Commercial remodels also include a $394,231 project by Diversified Contractors at 1501 32nd Ave. S., and a $100,000 project by Holm Construction Services at 101 42nd St. S. Parking lot improvements are underway at Lowry Engineering’s $560,000 lot at 3335 35th Ave. S.

Moorhead, though smaller in volume, shows significant residential investment. Thomsen Homes is building two new homes: one at 4707 Hampton Loop S. for $265,800 and another at 6762 Meadow View Drive S. for $283,300, plus a third at 6769 Meadow View Drive S. for $251,600. Gehrtz Construction has a $100,000 building alteration at 2777 34th St. S., and Thorsteinson & Sons is altering another building at 2221 29th St. S. for $18,100. Several smaller residential remodels are scattered across the city, including a $3,200 job by Remodeling by Foss at 1116 16th St. S. and a $5,867 project by Western Products at 1522 6th Ave. S.

Many permits are for relatively minor work: a $1,000 remodel at 1118 4th St. N. in Fargo, a $1,500 remodel in West Fargo, and a $1,000 job at 121 14th St. S. in Moorhead. Yet these small projects collectively reflect a healthy maintenance and upgrade market. The data, published by city building departments, is available through an interactive map that allows residents to click on dots for details. The map is a tool for transparency, letting neighbors see what’s being built on their block.

The permits were reported by the newsroom staff, based on official city records. The information is considered factual and verified from knowledgeable sources. As the region continues to grow, these permits offer a snapshot of economic activity, from the $1,000 handyman repair to the $1.3 million commercial development. The next few months will reveal how many of these projects break ground and reshape the local landscape.